Status: as of November 2026 (all sources checked on 24 November 2026). Regional R&D grants for larger programmes are currently suspended. Check the current status before you plan around them.
Who this is for
Corporates, scale-ups and research-intensive companies that want an engineering, R&D or innovation centre in Southern Italy, whether a team of 10 people or a lab of 200. Typical areas: AI and software, aerospace, advanced materials, nanotechnology, life sciences and agrifood tech.
Why Puglia
- Research infrastructure you can partner with. The IIT Center for Biomolecular Nanotechnologies is a large facility hosted by the University of Salento in Lecce (IIT). CNR NANOTEC has its main seat in Lecce and a second site in Bari (CNR NANOTEC).
- Four public universities. Politecnico di Bari, Università di Bari, Università del Salento and Università di Foggia, plus a regional technology transfer agency, ARTI, set up by Regional Law 29/2024 (ARTI).
- Organised industry networks. These include the aerospace technology district, DHITECH (the high-tech district at the Lecce Ecotekne campus) and the DARe agrifood district (UniBa, districts), and European Digital Innovation Hubs active in the region (EU EDIH catalogue).
- Incentives that stack. A national R&D tax credit, the Patent Box and the ZES Unica credit on lab and plant investment can all apply to the same centre.
- Proof that it works. InfoCamere's Bari centre grew from 16 people in 2001 to 180 today, 86% of them graduates (InfoCamere, June 2026).
Step-by-step path
- Scout (months 0-2). Map the university departments and labs that match your roadmap. Meet department heads, tech transfer offices and research centre directors. Shortlist a city: Bari for the broadest talent pool, Lecce for nanotech and materials, and the Brindisi-Grottaglie-Taranto area for aerospace.
- Sign framework agreements (months 1-4). Sign a memorandum of understanding with one or two universities covering joint research, internships, theses and access to labs. Agree IP rules up front: who owns background and foreground IP, and who holds licence options.
- Set up the entity and the site (months 2-6). Most foreign groups use an SRL subsidiary (see the dual-company playbook). For new buildings or plant, the ZES single authorisation can bring all the permits into one procedure (Dipartimento per il Sud).
- Build the talent pipeline (months 3-12). Co-fund industrial or innovative PhD positions under the doctoral rules (MUR, DM 226/2021). Universities publish calls for each doctoral cycle, usually in spring and summer, so align your budget with that calendar. Add sponsored master's theses, internships and senior hires from abroad who benefit from the researchers' or impatriati tax regimes.
- Fund the programme (months 6-18). Book the R&D tax credit and get the technical certification from a certifier on MIMIT's register. Consider the Patent Box for software and patents you develop. Claim the ZES credit on new equipment. Track the reopening of regional and national grant windows.
- Scale (year 2 onward). Run joint labs and join EU consortia as an EU entity.
Incentives and instruments
| Instrument | What it gives | Who manages | Status / source |
|---|---|---|---|
| R&D tax credit | 10% of eligible R&D spending, up to EUR 5 million a year, through 2031. Covers branches of non-residents too | MIMIT / Agenzia delle Entrate | In force. The southern uplift is not confirmed for 2026: check. MIMIT |
| Technological innovation tax credit | Credit for new or substantially improved products and processes | MIMIT | Check current status: MIMIT documents the rates only up to 2025. MIMIT |
| Patent Box | R&D costs on copyrighted software, patents, designs and models deducted at 210% (an extra 110%) | Agenzia delle Entrate | In force. Normattiva |
| ZES Unica tax credit | Credit on new equipment and buildings for projects of at least EUR 200,000 | Agenzia delle Entrate | 2024-2028. The usable share is set each year. Normattiva |
| Contratti di Programma | Regional support for large firms' R&D (up to EUR 60 million) and investment programmes of at least EUR 5 million, with SME or startup partners | Puglia Sviluppo | New applications suspended since 3 March 2026. Puglia Sviluppo |
| PIA | Regional support for SME R&D and investment programmes of at least EUR 1 million | Puglia Sviluppo | New applications suspended since 3 March 2026. Puglia Sviluppo |
| Contratti di sviluppo | National support for large investment programmes | Invitalia for MIMIT | Check current status. MIMIT |
| Industrial / co-funded PhDs | PhD positions co-designed and co-funded with companies | Universities, MUR | Calls for each doctoral cycle; check each university. MUR FAQ |
| Researchers' tax regime | 90% of research income excluded from tax for researchers who move from abroad | Agenzia delle Entrate | In force. Normattiva |
| Maxi-deduction for new hires | Increased deduction of the cost of net new permanent hires | Agenzia delle Entrate | In force for 2026. Normattiva |
Talent and people to meet
- Talent: graduates and ITS technicians for junior roles, PhDs and postdocs at universities, IIT and CNR for research roles. Senior leads are scarce locally, so plan to relocate some and hire returnees.
- People: university delegates for industry relations and department heads, IIT CBN and CNR NANOTEC directors, technology districts and Digital Innovation Hubs, ARTI and Puglia Sviluppo, R&D credit certifiers and IP lawyers.
Common pitfalls
- Signing university agreements with vague IP clauses.
- Claiming the R&D credit without the documentation and certification it requires.
- Budgeting for regional grants that are suspended.
- Missing the doctoral cycle calendar and losing a year.
- Hiring only juniors and expecting them to lead without senior anchors.
How PugliaTechs can help
We help you scout labs and departments, set up introductions with universities and regional agencies, and reach engineers and researchers in our community of 2,300+ tech people. We can also host your team at PugliaTechs Talks to build visibility before you hire.
Disclaimer. This playbook is for information only and is not legal or tax advice. PugliaTechs connects you with qualified advisers who can confirm what applies to your case.
Sources
Checked on 24 November 2026.
- IIT research centres: https://www.iit.it/centers
- CNR NANOTEC: https://nanotec.cnr.it/about/
- ARTI Puglia: https://www.arti.puglia.it/
- University of Bari, technology districts: https://www.uniba.it/it/ricerca/organismi-associativi-partecipati-da-uniba/distretti
- European Commission, EDIH catalogue: https://european-digital-innovation-hubs.ec.europa.eu/edih-catalogue/ap-edih
- InfoCamere press release, Bari, 8 June 2026: https://www.infocamere.it/dam/jcr:95ec142c-8fd3-4094-b9e4-e417e2fcdced/2026_06_08_Comunicato_Evento_Bari.pdf
- MIMIT, R&D, innovation and design tax credit: https://www.mimit.gov.it/it/incentivi/credito-d-imposta-r-s
- D.L. 146/2021, art. 6, Patent Box (Normattiva): https://www.normattiva.it/uri-res/N2Ls?urn:nir:stato:decreto.legge:2021-10-21;146~art6!vig=
- D.L. 124/2023, art. 16, ZES Unica tax credit (Normattiva): https://www.normattiva.it/uri-res/N2Ls?urn:nir:stato:decreto.legge:2023-09-19;124~art16!vig=
- Dipartimento per il Sud, ZES single authorisation: https://www.strutturazes.gov.it/
- Puglia Sviluppo, Contratti di Programma and PIA: https://www.pugliasviluppo.eu/sviluppo-aziendale-grandi-imprese and https://www.pugliasviluppo.eu/sviluppo-aziendale-medie-imprese
- MIMIT, Contratti di sviluppo: https://www.mimit.gov.it/it/incentivi/contratti-di-sviluppo
- MUR, doctoral programme FAQ (40th cycle): https://www.mur.gov.it/sites/default/files/2024-05/FAQ_40%20ciclo.pdf
- D.L. 78/2010, art. 44, researchers (Normattiva): https://www.normattiva.it/uri-res/N2Ls?urn:nir:stato:decreto.legge:2010-05-31;78~art44!vig=
- Legislative Decree 216/2023, art. 4 (Normattiva): https://www.normattiva.it/uri-res/N2Ls?urn:nir:stato:decreto.legislativo:2023-12-30;216~art4!vig=